Khair Muhammad
Direttore/Membro del Consiglio presso Heavy Electrical Complex Pvt Ltd.
Posizioni attive di Khair Muhammad
Società | Posizione | Inizio | Fine |
---|---|---|---|
Heavy Electrical Complex Pvt Ltd.
Heavy Electrical Complex Pvt Ltd. Electric UtilitiesUtilities Part of Ims Engineering Pvt Ltd., Heavy Electrical Complex Pvt Ltd. is a Pakistani public sector company that manufactures electrical equipment mainly used in 11kv and 66kv sub-stations and grid-stations of high voltage power supply systems. The company is based in Haripur, Pakistan. The present manufacturing range includes power transformers of unit rating up to 40 mva & voltage 132 kv. In near future, the company plans to commence production of 220 kv power transformers of unit rating up to 160 mva. The CEO is Pakistan Zindabad. Heavy Electrical Complex was acquired by Ims Engineering Pvt Ltd. on April 01, 2022 for $76.36 million. | Direttore/Membro del Consiglio | - | - |
Storia della carriera di Khair Muhammad
Statistiche
Distribuzione geografica
Pakistan | 2 |
Posizioni
Director/Board Member | 1 |
Settori
Utilities | 2 |
Posizioni ricoperte
Attive
Inattive
Società quotate in Borsa
Aziende private
Società collegate
Aziende private | 1 |
---|---|
Heavy Electrical Complex Pvt Ltd.
Heavy Electrical Complex Pvt Ltd. Electric UtilitiesUtilities Part of Ims Engineering Pvt Ltd., Heavy Electrical Complex Pvt Ltd. is a Pakistani public sector company that manufactures electrical equipment mainly used in 11kv and 66kv sub-stations and grid-stations of high voltage power supply systems. The company is based in Haripur, Pakistan. The present manufacturing range includes power transformers of unit rating up to 40 mva & voltage 132 kv. In near future, the company plans to commence production of 220 kv power transformers of unit rating up to 160 mva. The CEO is Pakistan Zindabad. Heavy Electrical Complex was acquired by Ims Engineering Pvt Ltd. on April 01, 2022 for $76.36 million. | Utilities |
- Borsa valori
- Insiders
- Khair Muhammad
- Esperienza