Sérgio Abu-Jamra Misael
Nessuna posizione attualmente
Profilo
Sérgio Abu-Jamra Misael worked as the Head of Construction Support Department at Itaipu Binacional SA from 1985 to 1992.
He then served as a Director at Fundação ITAIPU-BR de Previdência e Assistência Social from 1993 to 1997.
From 1998 to 2001, he was the President of Companhia De Habitação Popular De Curitiba.
He also served as an Independent Director at Companhia Paranaense de Energia.
Mr. Abu-Jamra Misael earned his undergraduate degree from Universidade Federal Do Paraná in 1974.
Precedenti posizioni note di Sérgio Abu-Jamra Misael
Società | Posizione | Fine |
---|---|---|
Companhia De Habitação Popular De Curitiba | Presidente | 01/01/2001 |
Fundação ITAIPU-BR de Previdência e Assistência Social | Direttore/Membro del Consiglio | 01/01/1997 |
Itaipu Binacional SA
Itaipu Binacional SA Electric UtilitiesUtilities Itaipu Binacional operates a hydroelectric power plant. It is a binational undertaking run by Brazil and Paraguay at the Paraná River on the border section between the two countries. Its generation capacity is 14 GW, with 20 generating units of 70 MW each. The company has offices in Curitiba, Brasília, Assunção and Ciudad del Este. Itaipu Binacional was founded in May, 1984 and is headquartered in Foz do Iguaçu, Brazil. | Corporate Officer/Principal | 01/01/1992 |
COMPANHIA PARANAENSE DE ENERGIA - COPEL | Direttore/Membro del Consiglio | - |
Formazione di Sérgio Abu-Jamra Misael
Universidade Federal Do Paraná | Undergraduate Degree |
Esperienze
Posizioni ricoperte
Attive
Inattive
Società quotate in Borsa
Aziende private
Relazioni
Relazioni di 1° grado
Aziende connesse in 1º grado
Uomo
Donna
Amministratori
Dirigenti
Società collegate
Società quotate in Borsa | 1 |
---|---|
COMPANHIA PARANAENSE DE ENERGIA - COPEL | Utilities |
Aziende private | 3 |
---|---|
Fundação ITAIPU-BR de Previdência e Assistência Social | Finance |
Companhia De Habitação Popular De Curitiba | |
Itaipu Binacional SA
Itaipu Binacional SA Electric UtilitiesUtilities Itaipu Binacional operates a hydroelectric power plant. It is a binational undertaking run by Brazil and Paraguay at the Paraná River on the border section between the two countries. Its generation capacity is 14 GW, with 20 generating units of 70 MW each. The company has offices in Curitiba, Brasília, Assunção and Ciudad del Este. Itaipu Binacional was founded in May, 1984 and is headquartered in Foz do Iguaçu, Brazil. | Utilities |
- Borsa valori
- Insiders
- Sérgio Abu-Jamra Misael